Orleans Conservation Commission
Work Meeting Nauset Room August 13, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 7/9/13 (JB1)
Steve Simon 8 & 10 Beach Road
Assessor’s Map 36, Parcel 23 & 24. The proposed installation of a water line. Work will occur within 25’ of the Edge of Wetland.
Last Heard 8/6/13
Richard A. Collison 189 Skaket Beach Road
by Ryder & Wilcox, Inc. Assessor’s Map 23, Parcel 17. The proposed upgrading of an existing septic system including the pumping & abandonment &/or removal of the existing system, & the installation of a water service to serve an existing single-family dwelling. Work will occur within 100’ of a Coastal Dune System.
Last Heard 8/6/13
Timothy F. Geithner 158 Tonset Road
by Ryder & Wilcox, Inc. Assessor’s Map 27, Parcel 7. The proposed repair of a timber stairway & the construction of a landing & steps onto an existing boathouse. Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & a Coastal Beach.
Revised Plan
Sarah Bartholomew 6 Harvey’s Lane
The proposed construction of an addition, patio, screened-in porch, and deck onto an existing dwelling has been revised to show changes to the Conservation Notes showing a once-a-year mow to the mitigation area and the patio retaining wall to be constructed from timber instead of block. Work will occur within 100’ of the Edge of Wetland.
Administrative Reviews
Dave Hubbard 41 Defiance Lane
The proposed cutting of phragmites. Work to be done by applicant.
Dick Rowson 14 Alden Road
The proposed removal of 2 Sycamore Maples and bittersweet. Work to be done by Arborsmith Landscape.
Harry Ahlheim 38 Briar Springs Road
The proposed repair of an existing septic system including the abandonment of an existing cesspool and the installation of a pump chamber and septic tank.
Anne Kilguss 17 Herring Brook Way
The proposed trimming of holly trees and removal of dead locust branches. Work to be done by After Hours Tree Service.
Michael & Priscilla Isner 14 High Tide Lane
The proposed removal of 4 trees.
Thomas Lazay 11 Salt Works Circle
The proposed removal of a leaning oak and the pruning of a second oak. Work to be done by A to Z Treez.
Robert Stromsted 8 Tides End Lane
The proposed trimming of a cherry tree and bushes.
Celeste Omerod 101 Brick Hill Road
The proposed removal of 2 storm damaged trees. Work to be done by Tree Fellers.
Charles Woodward 17 Lucy’s Lane
The proposed removal 1 trees. Work to be done by Bartlett Tree Experts.
Phil Benton 34 Twinings Lane
The proposed reduction of all oak species in rear to 2-3’. Work to be done by Bartlett Tree Experts.
McClennen Ed F Est/Jalkut 661 S. Orleans Road
The proposed repair of the scarp at the boathouse and repair of the boathouse. Work to be done by Wilkinson Ecological Design.
William Apgar 24 Ellis Road
The proposed removal of oaks by wires, the broken top of an oak, the pruning of pine and oak limbs, and the removal of all low brush and saplings between the grass and the road. Work to be done by A to Z Treez.
Chairman’s Business
Approval of the Minutes from the meeting on May 21, 2013.
Other Member’s Business
Administrator’s Business
Request approval of Snow’s Estimate for replacement of the Oil Tank at Sea Call Farm
Site Visits
The Whole Clam LLC 5 Route 6A
by Baxter-Nye Engineering & Surveying. Assessor’s Map 18, Parcel 52. The proposed renovation of the existing restaurant, construction of a new septic system & stormwater management facility, rebuilding of a retaining wall, & landscaping. Work will occur within 100’ of Land Subject to Flooding.
Jonathan S. Weiss & Susan Lee Bruce 24 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 3. The proposed repair of existing revetment. Work will occur on a Coastal Bank, within Land Subject to Coastal Storm Flowage, within Land Subject to Flooding, & within 100’ of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, & the Nauset Estuary.
Stephen Brodeur 25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4. The proposed reconstruction of a stone revetment, installation of stone retaining walls, removal of existing patio areas, and mitigation plantings has been Amended to extend the revetment reconstruction and restore the bank from recent storm event damage. Work will occur on the Top of a Coastal Bank, within Land Subject to Coastal Storm Flowage, and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, and the Nauset Estuary.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|